DIY Project Guide

How to Measure and Order Custom Drip Edge for a Shed Repair

Before ordering replacement drip edge, measure two different things: each roof-edge run and the metal profile’s cross-section. Keep them separate, then plan piece lengths and joints from the instructions for your actual roof covering—not from a guessed waste percentage.

Short answer: Sketch the shed roof, label each edge, and measure the full physical run where trim will sit. Separately record the top leg, fascia leg, drip projection, and any returns or hems from a known-good sample or a supplier-approved drawing. Then turn each run into a piece schedule using the roofing system’s specified cuts and joint laps. A custom profile is worth considering only if the standard replacement part does not match the roof system or the existing edge.

Measurement guide, not an installation detail. Opening a roof edge can disturb shingles, underlayment, metal panels, or flashing. Do not pry apart a sound roof just to measure it. Follow the exact roofing product instructions and local requirements; get a roofer or fabricator to confirm an unclear profile or joint.

Make a roof map and a profile sketch

Give every edge and profile its own label. A gable-roof shed typically has two eaves and four rake runs—two from the ridge to an eave at each gable end; a single-slope shed has a different edge layout. A roof-to-wall intersection may need a wall-flashing detail rather than ordinary drip edge. The drawing below shows how to keep the run measurements separate from the cross-section legs.

Shed drip-edge run and cross-section measurement sketch A gable roof plan labels two eaves at ten feet eight inches and shows four separate rake runs, two at each gable end. Below, a conceptual roof-edge cross-section identifies the roof leg, fascia leg, drip projection, roof deck, roofing, and fascia. 1. ROOF MAP · MEASURE EACH PHYSICAL EDGE RIDGE · NOT DRIP-EDGE RUN EAVE 1 · 10 ft 8 in EAVE 2 · 10 ft 8 in R1 R2 R3 R4 Each gable end has two rake runs; measure each ridge-to-eave slope separately. Illustrative dimensions only; measure your shed independently. 2. CROSS-SECTION · RECORD PROFILE LEGS SEPARATELY ROOFING LAYER ROOF DECK FASCIA A · ROOF LEG B · FASCIA LEG C · DRIP PROJECTION ORANGE = CONCEPTUAL METAL PROFILE
The roof map and cross-section are original planning sketches, not a fabrication drawing or universal installation detail. The sample run dimensions are only for the worked example below. Ask the supplier which face of each bend to measure and how to specify hems, returns, and bend allowances.

What to gather before measuring

Measure in four passes

  1. Identify the roof covering and each edge.

    Record whether the shed has asphalt shingles, exposed-fastener metal panels, or another roof system. Mark each low eave, each sloped rake or gable edge, and any edge that meets a wall. An edge at a wall may need a sidewall flashing assembly, not a drip-edge substitute; the 2024 IRC model text for wall-roof intersections illustrates the separate flashing requirement where that code applies. Roofing terms and trim parts vary by system. For a shingle roof, record the exact product too: GAF's R-141 advisory recommends drip edge at eaves and rakes on its shingle roofs and tells users to follow current shingle-product instructions; that guidance is specific to GAF systems.

  2. Inspect what the old metal was covering.

    Photograph the existing profile, its orientation, visible fasteners, joints, and condition of the fascia and roof deck. Soft wood, staining, loose panels, or damaged shingles are repair issues to resolve before covering the area. An old bent or corroded piece can be a misleading pattern; do not treat it as a reliable template without checking the roof manual.

  3. Measure the runs along the actual edges.

    Measure from the actual start of one trim run to its end along the edge where the part will sit. A sloped rake is longer than its horizontal projection, so do not substitute the shed footprint. Record the two eaves and two rakes separately even if they look alike. Note corners, breaks, walls, gutters, existing joints, and any change in roof or fascia geometry.

  4. Capture the cross-section as a different set of dimensions.

    On a safe, accessible sample or supplier-approved sketch, label each leg in order from the roof side to the outer edge. Record the roof/top leg, fascia-cover leg, drip projection, hems, returns, and bend direction. Also note whether each number is taken inside, outside, or to a bend centerline—the fabricator must tell you which reference it needs. Do not simply add leg measurements and call the sum a flat blank width; bends and hems affect the developed profile.

Turn the edge measurements into a piece plan

A total run is a survey number, not automatically a cut list. For every continuous edge, note the proposed piece start and end, finished cut length, joint location, overlap or connector, and end treatment. Ask the roof-covering manufacturer or supplier which piece lengths and joints are approved for that roof system. Add only documented laps, end details, and cut allowances. There is no universal shed-roof waste percentage.

For asphalt shingles, the 2024 International Residential Code, Section R905.2.8.5 specifies a minimum 2-inch overlap between adjacent drip-edge segments when that model-code provision applies. The section also distinguishes underlayment placement at eaves and rakes. It is a model-code provision for shingle roofs—not a universal joint detail for every shed, jurisdiction, or metal-panel roof. Confirm local adoption and amendments, and follow the specific roof manufacturer's instructions.

Worked example: a small gable shed

Illustrative measurements only: suppose a gable-roof shed has two measured eaves of 10 feet 8 inches each and four measured rake runs of 8 feet 2 inches each—two from the ridge to the eaves at each gable end. Assume the measurements have already been taken along the actual edges and there are no extra returns in this simple sketch.

Run groupMeasured edgesGross edge lengthKeep separate until confirmed
Eaves10 ft 8 in + 10 ft 8 in21 ft 4 inEave profile and piece/joint plan
RakesFour runs × 8 ft 2 in32 ft 8 inRake profile and piece/joint plan
All measured edgesBoth groups combined54 ft 0 inDo not combine if the systems require different parts

Now imagine one 10-foot-8-inch shingle-roof eave must be split into a 6-foot piece and a 4-foot-10-inch piece. Under the limited example of a 2-inch approved overlap, those cut lengths cover 10 feet 8 inches: 6 feet + 4 feet 10 inches − 2 inches. That arithmetic only illustrates how a specified lap changes coverage. It does not tell you where a joint belongs, include end cuts, or replace the roof-maker's instructions. If its detail calls for a different lap, use that requirement instead. Do not apply this shingle example to metal panels.

Write down both numbers: keep the measured installed run and the sum of the proposed cut-piece lengths as separate fields. A piece schedule can be longer than the covered run because joints overlap; that difference is determined by the approved joint plan, not by a generic percentage.

Prepare a complete order brief

If the roof uses a proprietary panel system, ask its supplier to identify the matching edge trim before commissioning a custom shape. Fabral's Grandrib 3 and Alu-Tuff guide, for example, uses product-specific roof sketches, sections, accessory names, and order forms. Its dimensions and parts apply to the named system, not to every shed roof.

Where Trimgy may help—and what it does not do

If a roofer or roofing supplier confirms that a custom sheet-metal cross-section is appropriate, Trimgy can help you draw that profile and view an instant trim-price estimate. The drawing interface uses inches and a quarter-inch grid increment. The live material selector includes 22-, 24-, and 26-gauge steel and 0.032-, 0.040-, 0.050-, and 0.063-inch aluminum thickness options; which option suits a roof is a separate decision for the system supplier or fabricator. The pricing endpoint rejects profiles with a calculated stretch-out over 48 inches.

The profile drawing is not a roof survey or a confirmed cut list. Trimgy does not choose eave versus rake trim, determine the correct joint or lap, calculate a universal waste amount, or certify a profile for local code, roof compatibility, fabrication, or leak prevention. Its estimate returns trim pricing based on the drawn profile, selected thickness and color, and entered footage; it expressly excludes shipping and tax.

To order in the current interface, you must sign in, save the trim, select a thickness and color, choose start and end edge types, and resolve unsaved changes or intersecting lines. The Order panel also requires linear footage in multiples of 10. That is an application input rule—not a roofing cut plan or a waste recommendation. Shipping quotes and applicable tax are handled separately in the order flow; review the available charges and full total before payment. The drawing workspace opens behind a sign-in screen.

Practical next step: Have the roof supplier or roofer confirm the profile and piece/joint plan first. If they approve a custom cross-section, bring the labeled profile sketch to Trimgy's drawing workspace (sign-in required) and compare the drawn shape with their written requirements.

Mistakes that lead to a mismatched order

Safety and code notes

Measuring does not require walking on the roof. If an edge cannot be reached safely from the ground or a stable platform, stop and hire a qualified roofer. Keep ladders on stable ground, do not lean beyond the rails, and avoid work in wet, icy, or windy conditions. Sheet-metal edges are sharp; use suitable gloves and eye protection when handling a sample. OSHA's ladder guidance is written for construction workers and is not a homeowner-specific risk assessment. A metal-roof manufacturer's own safety warnings also apply to its panels.

Code applicability depends on the roof covering, shed, jurisdiction, and adopted code edition. The 2024 IRC citation above concerns asphalt-shingle roofs; a small shed may have different local permit or code scope, and metal-roof assemblies use their own product instructions. Ask the local building department when requirements are unclear.

Related guide

This article focuses on measurements and order preparation. For a separate overview of named drip-edge profile types and their typical geometry, see Custom Drip Edge Types and When to Use Each. Confirm any profile or dimension against current product instructions and local requirements before ordering.

Sources and scope

Frequently Asked Questions

Should I add a fixed waste percentage when measuring drip edge?

No single waste percentage fits every shed. Measure each edge, make a piece-by-piece cut plan, and add only the laps, end details, or cut allowances required by the applicable code and the specific roofing or trim manufacturer's instructions.

How do I measure a sloped rake edge?

Measure along the physical roof edge where the trim will sit, from its actual start to its end. Do not use the shorter horizontal building dimension in place of the sloped edge measurement.

Can the eaves and rakes use the same custom drip-edge profile?

Sometimes, but do not assume so. The roof covering, edge construction, manufacturer instructions, and local requirements can call for different profiles or installation sequences. Keep the eave and rake measurements separate until the supplier confirms the part.

Does Trimgy choose the right profile or turn my measurements into a cut list?

No. Trimgy lets a signed-in user draw and price a custom sheet-metal profile, but it does not identify the correct roof detail, verify code compliance, or generate a confirmed roof-edge cut and joint plan. Have the roofing-system supplier or a qualified roofer confirm those details.

Does Trimgy's instant trim estimate include shipping and tax?

No. The trim-price estimate excludes shipping and tax. The separate order flow can show shipping quotes and applicable tax; review the charges and full total shown there before payment.